Nexprime SCM Response

Bespoke High-performance Supply Chain Planning Solution

A cutting-edge Supply Chain Planning solution that can optimize supply plans to meet market
demand based on business strategy, while flexibly responding to user needs.

Can we make swift decisions using scenario-based planning in response to rapidly changing market demand and supply conditions? With complex processes and diverse user needs, is there a solution that can handle it all?

Rapidly shifting demand and supply landscapes require a dramatic improvement in planning speed- it's key!

Discover Nexprime SCM Response, a high-performance supply chain planning solution capable of handling complex processes and implementing diverse, unique business logic.
Why Samsung SDS Nexprime SCM Response?
  • High-Performance Solution

    Enables agile decision-making through rapid planning speed

  • Flexible Architecture

    Allows planning logic to adapt to evolving business environment

  • Optimized Planning

    Incorporates complex, multi-dimensional constraints.

A high-performance SaaS SCM solution that optimizes supply plans by aligning with business strategy and responding to market demand.

Data collection
  • Business strategy
  • Demand
  • Inventory
  • Logistics
  • Capacity
  • Product/BOM
Planning
Result generation
  • Demand fulfillment plan
  • Shipment Plan
  • Production plan
  • Procurement plan
  • Packing & PSI plan
  • Shortage root causes

Features

Unparalleled Planning Speed

Unparalleled Planning Speed

Customizable Planning Logic

Customizable Planning Logic

Goal-Based Operational Optimization

Goal-Based Operational Optimization

A grouped bar chart titled "Revolutionize planning time with intelligent resource search algorithms and advanced technologies for handling large-scale supply chain data." Three customer cases are compared across three bar series: Vendor X (dark gray), Vendor Y (medium gray), and Nexprime SCM Response (blue). Company A (Consumer Electronics): Vendor X 20.5 min, Vendor Y 23.5 min, Nexprime 3.4 min — reductions of 83% and 86% respectively. Company B (Semiconductor): Vendor X 19.7 min (no Vendor Y bar shown), Nexprime 1.5 min — reduction of 92%. Company C (Semiconductor): Vendor X 320 min (bar truncated with a break symbol indicating an extremely large value), Nexprime 9.4 min — reduction of 97%. Blue dotted arrows indicate the percentage reduction from each vendor baseline to the Nexprime result.
A conceptual diagram titled "Offers the ability to customize planning logic, allowing plans to meet each customer's unique situation and business needs." On the right, a human-profile icon labeled "Requirements" (with a gear symbol on the head) represents customer-specific needs. A large blue arrow points left toward a list of addable logic options: "+ Inv. Optimization," "+ Min. Utilization," and "…" (indicating extensibility). These logic options connect via dashed lines to a central robot-like icon, which represents a logic module. A red downward arrow labeled "Add Logic" shows that new logic can be inserted into the platform below. The lower section depicts the Nexprime SCM Response platform (dark gray bar with a gear icon and the platform name). Three identical module icons—Logic 1, Logic 2, Logic 3—are shown embedded within the platform, illustrating that multiple logic configurations can coexist and run simultaneously.
A side-by-side comparison diagram titled "Securing optimal job sequencing plans by the configuration adopting various goals and constraints for each process." Customer A — "Focused on on-time delivery rate": Goal Priority table: (1) Fulfillment ↑, Rule: No Delay — ON; (2) Delay ↓, Rule: Line Balance — ON; (3) Setup Time ↓, Rule: No Lot Split — OFF. Result: Job change 8 cases (Operating rate 80%), Delayed delivery 2 cases. Gantt chart shows Equip 1, Equip 2, and Equip 3 across periods D1–D4, with multiple setup intervals (labeled "Set up") distributed across all three equipment lines, reflecting frequent job changes to prioritize fulfillment. Customer B — "Focused on equipment utilization rate": Goal Priority table: (1) Setup Time ↓, Rule: No Delay — OFF; (2) Delay ↓, Rule: Line Balance — ON; (3) Fulfillment ↑, Rule: No Lot Split — OFF. Result: Job change 3 cases (Operating rate 90%), Delayed delivery 5 cases. Gantt chart shows Equip 1, Equip 2, and Equip 3 across periods D1–D4, with fewer setup intervals, longer continuous job blocks, and work concentrated toward D3–D4, reflecting a schedule optimized for equipment utilization at the cost of more delayed deliveries. Bar colors: light gray = idle or early-period jobs, dark navy = primary job blocks, blue = secondary job blocks.
01

Support Plan

Nexprime SCM Support Plan offers services categorized into Standard and Premium grades.

  • Standard tier is included as the basic option.
  • Premium tier provides:
    • Priority response times categorized by severity level,
    • Credit-based plan result analysis and training services.

FAQs

  • Through workflow customization feature, Nexprime SCM Response facilitates flexible modification of planning logic in response to business changes even after implementation.

  • We plan to provide a cloud-based supply planning solution that integrates with customer systems to generate a comprehensive supply plan. (2H 2025)

  • Nexprime SCM Response demonstrates outstanding performance in building three-year or longer plans.

  • Nexprime SCM Response offers the most optimal workflow after simulations of various work combinations.
    By identifying priorities on each constraint, the solution can generate the optimal output satisfying users' requirements by process.

  • Our solution enables you to build supply plans within minutes using unique search algorithms and parallel data processing technology. The rapid planning speed provides you with the opportunity to compare and review various scenarios, helping you make optimal decision

Let's talk

Samsung SDS will be your digital transformation service specialist.